Détails du projet

Vue d'ensemble

Titre du projet

South Asia Subregional Economic Cooperation Road Connectivity Project - DoR/SASEC/19-20/14 Detailed study and design of mitigation measure at Bhawanijhora (landslide area), Pasakha, Bhutan

Programme National / Plan d'Action
Tender / Procurement notice
23 avr 2020
Extension
23 mai 2020

Publié

23 mai 2020

Date limite

1 juin 2020

Budget

434 643 USD


Type d'approvisionnement

Services

Référence

39225-034 Package DoR/SASEC/19-20/14 Detailed study and design of mitigation measure at Bhawanijhora (landslide area), Pasakha, Bhutan

Bailleur de fonds

ADB - Banque Asiatique de Développement


Durée estimée

9 mois


Pays

Bhoutan

EXTENSION

Deadline of Submitting EOI: 01-Jun-2020 11:59 PM Manila local time

Consultant Type Firm
Selection Method Quality and Cost-Based Selection (QCBS)
Source International
Technical Proposal Simplified Technical Proposal (STP)

Selection Title South Asia Subregional Economic Cooperation Road Connectivity Project

Package Number DoR/SASEC/19-20/14
Package Name Detailed study and design of mitigation measure at Bhawanijhora (landslide area), Pasakha, Bhutan

Advance Action No

Engagement Period 9 MONTH

Consulting Services Budget USD 430,466

Budget Type Estimated

Approval Number 0400
Approval Date 31-Jul-2014
Estimated Short-listing Date 03-Jun-2020
Estimated Commencement Date 01-Nov-2020

Open to non-Member Countries No

Additional Information
Possibility of contract extension Not known
Possibility of consideration for downstream assignment Not known
Indefinite Delivery Contract (IDC) No

Country of assignment Bhutan

Country of eligibility for national consultants Same as country of assignment

Contact Information
Project Officer Tshewang Tshewang
Department of Roads
Email tshewang@mowhs.gov.bt

Agencies

Primary Agency Country Agency Role
Department of Roads Bhutan Implementing Agency
Department of Roads Bhutan Executing Agency
Phuentsholing Thromde Bhutan Implementing Agency
Phuentsholing Thromde Bhutan Executing Agency

Cost Estimate

Competitive Items Amount in USD
Remuneration and Other Expenses
All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc.379,405
Sub-total

379,405

Non-Competitive Items Amount in USD
Provisional Sums 15,887
Contingency 39,351
Sub-total
55,238

TOTAL

434,643

Terms of Reference

Primary Expertise Geo-technical Engineering, Geological, Hydrology,
Structural Engineering

TOR Keywords landslide, mitigation measures, Geo-
technical investigation, counter measure

Objective and Purpose of the Assignment

The Project is intended to carry out detailed geotechnical studies and design mitigation measures
at Bhawanijhora (landslide area), Pasakha, Chhukha Dzongkhag (District). The design consultant
shall prepare a detailed design report but not limited to:

(i) Preparation of detailed study report and recommendation of three alternative countermeasure
structures;
(ii) Designing of countermeasure structures after acceptance by client;
(iii) Preparation of a complete set of design report that shall include analysis, detail drawings,
technical specifications, bill of quantities (BoQ), rate analysis, cost estimation, Quality
Assurance Plan (QAP), schedule and construction methodology;
(iv) Ensuring the required studies and tests are carried out but not limited to the test specified
by the client;
(v) Ensuring the climate change factors are incorporated in the design;
(vi) Ensuring the best international practices are adopted.

Expertise or Positions Needed

International

Team Leadership from International Experts

Expertise or Position Inputs in PM Primary Place of Assignment
1 Geo-technical Engineer 5 Phuentsholing, Bhutan
2 Geologist 3 Phuentsholing, Bhutan


Hyperlinks to Related Project Dossiers:

http://www.assortis.com/public/files/ADB621741.pdf